Application Guide
N/A
5 in stock
N/A
Surface preparation: 1. Concrete no special surface preparation is required, remove dust dirty, oily material and apply the paint directly to the surface.
2. Steel preferably blast cleaning is required in case blast cleaning is not possible; surface should be cleaned, mechanically.
Covering: 9-11 Sq. Meter / Ltrs.
Application: Brush, Roller, Spray
Dry time: S.D: 2 hour
Recoatable 16 Hours.